Server Room Cooling Plymouth

Server room and comms room cooling in Plymouth, designed and installed by HPE Airflow SW Ltd. This is not comfort cooling. It is equipment protection, and it is specified in a completely different way.

We are F-Gas certified and an NICEIC Approved Contractor, so the refrigerant work and the electrical supply are both handled in house.

Why a server room is not just a hot office

An office needs cooling when the weather is warm and people are in it. A server room needs cooling every hour of every day, all year, including Christmas morning, because the heat is coming from the equipment rather than from outside.

That changes everything about the specification. The load is constant and predictable rather than variable. It does not fall away at night. And crucially, a failure is not an inconvenience, it is downtime: overheating equipment throttles, then shuts down, and in the worst cases does not come back.

A domestic-style system in a small comms room, sized on room volume, will run continuously at full output and fail early. We size on the actual heat output of the equipment in the rack, not on the size of the cupboard it sits in.

Resilience: what happens when it fails

A comfort cooling system in an office can fail on a Friday and be dealt with on Monday. A server room cannot, and this is where most of the design effort actually goes.

A small comms room with a single unit will reach uncomfortable temperatures within minutes of that unit stopping, because the heat load is constant and there is no thermal mass to speak of. Equipment throttles first, then shuts down to protect itself, and the business finds out when something stops working rather than when the air conditioning stops working.

The standard answer is two units rather than one, each sized to carry the full load on its own, alternating on a duty and standby rotation so both stay exercised and neither becomes the one that has not run since it was commissioned. It costs more up front and it is the difference between a fault and an outage.

Monitoring matters as much as the hardware. A temperature alarm that sends someone a message when the room passes a set point turns a potential shutdown into an inconvenience. We can supply the alarm contacts for connection to your existing monitoring, or fit standalone alerting where there is nothing to connect to.

The other question worth asking early is what happens in a power cut. If your servers are on a UPS and a generator but the cooling is not, you have bought yourself only the few minutes it takes the room to overheat.

Why ordinary air conditioning is the wrong tool

Plenty of comms rooms around Plymouth are cooled by a domestic split system somebody fitted because it was cheap and available. It works, until it does not, and the reasons are worth understanding.

A comfort cooling unit is designed for a room occupied by people during the day, in summer. A server room needs cooling twenty four hours a day, all year, including in January when the outside temperature is close to freezing. Many standard units simply will not operate reliably at low outdoor ambient temperatures without additional low ambient controls, because they were never intended to.

Then there is the duty cycle. A domestic unit running continuously at full load year round is doing something it was not built for, and it will wear out years earlier than the same unit in a bedroom.

Humidity is the third factor. Comfort systems dehumidify as a side effect of cooling and take no view on the result. In a server room, air that is too dry raises the risk of static discharge and air that is too damp risks condensation on cold surfaces. Close control equipment manages both deliberately.

None of this means you always need close control kit. A small comms cupboard is often perfectly well served by a well chosen split with the right low ambient package. It means the choice should be made deliberately rather than by whatever was on the van, and we will tell you which category your room falls into.

How we specify it

Sized on equipment load. We work from what the hardware actually dissipates, with headroom for what you will add over the next few years. Comms rooms always gain equipment and never lose it.

Year-round operation. Standard air conditioning is not designed to cool when it is cold outside. Server rooms need it to, which means equipment specified for low ambient operation rather than the cheapest unit that fits the output figure.

Continuous duty. Kit that will run thousands of hours a year without complaint, rather than domestic equipment expected to work eight weeks each summer.

Resilience where it matters. For business-critical rooms, two smaller units sharing the load beats one large one. If one fails, the room stays within tolerance while it is repaired instead of climbing until something shuts down.

Alarms. A temperature alarm that tells someone before the servers do is the cheapest part of the whole installation and the part people most often leave out.

Common problems we get called to

The most frequent one is a comms room that was fine when it held a switch and a router, and now holds a full rack. Nobody re-specified the cooling as the equipment grew, and it now runs at maximum permanently.

The second is a unit that cools perfectly in July and cuts out in January, because it was never intended to run in low outdoor temperatures.

The third is airflow. A correctly sized unit blowing into the back of a cabinet, or with its return path blocked by boxes stacked in the only spare floor space, will not deliver its rated output. Sometimes the fix is layout rather than equipment.

We are happy to look at an existing installation and tell you whether it needs replacing or simply putting right. See also air conditioning repair.

Server room cooling questions

You can, and plenty of people have, but it is the wrong tool. Domestic split systems are designed for intermittent comfort cooling with people in the room. A comms room runs a constant heat load 24 hours a day, all year, and needs equipment rated for it.

It depends on the hardware, so we work from the manufacturer’s stated operating range for what is actually in the rack rather than a rule of thumb.

If a cooling failure would take your systems down, yes. We usually specify N+1, meaning a second unit that can carry the load on its own, so a fault does not become an outage.

On the equipment load, taking account of what the hardware dissipates plus headroom for growth, rather than on room area.

More often than comfort cooling, because it runs continuously. We will set a schedule to suit the installation and the criticality of the room.

Business premises across Plymouth and the surrounding towns, including Saltash, Ivybridge, Tavistock, Callington, Liskeard and Torpoint.

Maintenance is not optional here

A comfort cooling system that is overdue a service makes an office slightly less pleasant. A server room system that fails takes the business offline.

We put comms room cooling on a planned servicing schedule with shorter intervals than a normal commercial installation, because the running hours are so much higher. Filters clog faster, and a blocked condensate drain in a room full of electrical equipment is a problem you want found on a service visit rather than by an engineer at midnight.

Refrigerant leak checking above certain charge sizes is a legal requirement with records to be kept. Our F-Gas number is 2000776.

Arrange a site survey

Call 07789 373208 or send an enquiry. We will look at the room, the rack, the airflow and the growth you are expecting, and specify accordingly.

See also commercial air conditioning installation for the rest of the premises.